CLIENT |
DESCRIPTION |
DATE |
Debswana |
Logwasher Relocation project |
2010 |
Gem Diamonds |
Letšeng Diamond Mine – upgrade study |
2010 |
Anglo American Gold |
Detailed design for a 250 tph thickening and filtration plant |
2008/2009 |
Debswana |
Jwaneng MTTP Class 3 Design |
2010 |
Rio Tinto (India) |
Fluor/ADP alliance for new Diamond Mine study. Fluor lead – ADP responsible for DMS and FR plants. Bunder project. |
2010 |
Rio Tinto (Zimbabwe) |
Fluor/ADP alliance for Murowa Mine expansion study. |
2010 |
Raminex |
Gold Treatment plant study – Gravity and CIL |
2010 |
Namdeb |
Feasibility study for new 750 tph Sendelingdrift mine |
2010 |
Namdeb |
Construction of probe drilling jack-up platform and aerial rope way system for access to the jack-up from the beach whilst in the surf zone |
2010 |
De Beers |
Study to resolve the bottlenecking due to fines-rich feed |
2010 |
De Beers (Venetia Mine) |
Study to upgrade evaluate technologies for upgrading Mixed ore stockpile |
2010 |
De Beers (Angola Mine) |
Appointed as EPCM partner for desktop study for new mine |
2010 |
Metco (Angola) |
Supply of a G6000 diamond modular prospecting plant to Angola |
2010 |
Debswana |
Morupule Colliery Expansion Implementation (Alliance with Fluor) |
2010 |
De Beers (Venetia Mine) |
Magnetic Seperation Installation Project |
2010 |
Anglo American Gold |
Supply and construction of complete crushing, DMS and Fine gold gravity recovery circuit |
2008/2009 |
Debswana (Coal) |
Morupule Coal Feasibiliity Study 4mpta upgrade of entire mine (in alliance with Fluor) |
2009 |
Mountain Province/ De Beers Canada |
Feasibility study for Gahcho Kue Mine process plant – Hatch lead ADP design Final Recovery and twin 200 tph DMS plants |
2008 |
Debswana |
Detailed design of new Orapa 3 Final Recovery plant (with FLuor as EPCM lead on overall project) |
2009 |
Lucara Diamonds (Mothae project Lesotho) |
Conceptual study for complete new 2.5 mpta Diamond Mine adjacent to Letseng in Lesotho |
2009 |
Debswana |
Detailed design of a 400tph large scale modular complete dump re-treatment plant including Final Recovery |
2009 |
Debswana |
Design and construct of a 300tph logwasher reload plant |
2009 |
Namdeb |
Feasibility study to evaluate the optimal long term future for Elizabeth Bay Mine |
2009 |
Vosta LMG (Malaysia) |
CSD 500 Dredger construction - E&I management services by ADP |
2009 |
De Beers |
Feasibility study – Block 5 underground expansion. Underground Water and services reticulation system. |
2009 |
Anglo Gold Ashanti |
Feasibility study – new belt filter residue handling plant |
2009 |
Anglo Gold Ashanti |
Supply and construction of complete crushing, DMS and Fine gold gravity recovery circuit |
2008/2009 |
Debswana |
Upgrade of test final recovery plant at Orapa to a production plant |
2008 |
Debswana |
Design and supply of a logwasher tailings washing plant at Jwaneng mine |
2008 |
De Beers Canada |
Viability study for Gahcho Kue Mine |
2008 |
Namakwa Diamonds (South Africa) |
Implementation of three x 600tph process plants in the North West province |
2008 |
Namakwa Diamonds (DRC) |
Modular diamond bulk sampling plant for the DRC including MB70, 30tph DMS and Wet X-Ray final recovery plant |
2008 |
Vaaldiam (Brazil) |
Modular diamond washing plant for Brazil including MB100, 30tph DMS and Wet X-Ray final recovery plant |
2008 |
Namdeb |
Class 2 design study for a pre treatment plant at Elizabeth Bay capable of handling 22,500m3 of slurry from a trailing hopper suction dredger |
2008 |
Gem Diamonds |
15tph DMS for Indonesia |
2008 |
De Beers (Venetia Mine) |
Study: Treatment plant conceptyual study, bulk underground sample, Red Area dust extraction. |
2008 |
Namdeb |
Class 2 design study for the conversion of the Jet Rig to a Bauer BG 24 Sampling Platform |
2008 |
Namaqualand Mines |
Study: Mitchell’s Bay upgrade. |
2008 |
De Beers / DRA |
Study: AK06 Final recovery plant feasibility design – 16 tph plant with Modrup wet X-Ray, Wet Magsep and grease scavenging |
2008 |
Anglo Gold Ashanti |
Design a gold slimes pond cleaning dredger for Africa- |
2008 |
Transhex |
Design and deliver an annular jet pumping system fitted to an excavator |
2008 |
Namdeb |
FTP class 3 feasibility study |
2008 |
Namdeb |
Innershelf class II study for handling THSD feed at up to 18 000 m3/hr of slurry through mega screening and cycloning on shore at EBay |
2008 |
Debswana |
Jwaneng treatment plant business improvement study with Fluor – evaluation of AG milling versus crusher upgrade |
2008 |
Catoca – Lapis project |
MB40, 15tphr DMS and final recovery including two-stage Flowsort X-ray, attritioning Metso mill and grease table. |
2007/8 |
Gem Diamonds |
15tph DMS Indonesia |
2007/8 |
Stellar Diamonds |
Complete alluvial plant including MB100, 30tph DMS and FR for Guinea |
2007/8 |
ITM mining |
MB200/MB100 pre-treatment washing plant to treat 150m3 per hour |
2007/8 |
Namdeb |
Pocket Beaches plant move |
2007/8 |
BHPB / ATS |
Saurimo Final Recovery - Design & supply of a Sampling Final Recovery at the BHP main camp in Saurimo. The recovery includes two-stage Flowsort X-ray and Oblique grease belt. |
2007 |
Gem Diamond |
Study for river dredging system – central Africa |
2007 |
Namdeb |
Complete rebuild of electrical reticulation system No 3 plant |
2007 |
Namdeb (study) |
Study to develop optimal solution for accreting the beaches using dredging and high capacity overburden stripping technology |
2007 |
De Beers Prospecting Africa |
Complete modular Kimberlite sampling plant including final recovery for Africa, including scrubbing, DMS, crushing and FR |
2007 |
Debswana |
Design and supply of a recovery plant at Orapa to test latest wet X-Ray technology from De Beers and Ultra Sort plus Oblique grease belt technology |
2007 |
Projecto Cuango |
MB100 scrubbing and screening plant and grease scavenging modular plant for existing recovery system. |
2007 |
De Beers Group Technical |
Study - new 14tph Final Recovery plant for AK06 mine |
2007 |
Namakwa Diamonds |
Study – new 200tph Kimberlite mine - Africa |
2007 |
Rio Tinto/Fluor |
Study – new fine diamond recovery upgrade to Diavik plant |
2007 |
Namdeb |
FEED study 2600 tph Floating treatment plant plus dredge upgrade |
2007 |
SLDC Sierra Leone |
Design and supply of three MB70 alluvial pre treatment plants, a 65tph DMS and containerized final recovery |
2006 |
Rio Tinto |
Design and supply of a complete Kimberlite sampling plant with 10tph DMS, water recovery system and Final recovery plant |
2006 |
Namdeb |
Design study for large diamond optical sorting plant |
2006 |
Namdeb |
Design and supply of complete 900 tph screening and pumping system for EBay Mine |
2006 |
SLDC |
New modular containerised Final recovery plant using Flow Sort wet X-Ray technology |
2006 |
Gem Diamond |
MB100, 65tph DMS and containerised Final recovery utilizing Ultra Sort SW3 wet X-Ray technology |
2006 |
Namdeb |
Design study for third Walking jack-up platform mining system |
2006 |
African Star Minerals |
150 tph Dry crushing (preferential jaw crushing) plus 75tph twin 420mm cyclone DMS plant |
2006 |
De Beers Namaqualand Mines |
Class III study for 250 tph dump treatment plant including preferential jaw crushing and 75tph DMS plant |
2006 |