E-Bay Final Recovery

Namdeb

The Elizabeth Bay Final Recovery, built in 2004 is a 1,4 tonne per hour diamond final recovery plant using De Beers "CDX" and "XST" dry X-Ray technology and "Raven" single particle sorting, contained in a purposed-built steel frame brick "impervious" building.

The plant is fully automated using Siemens S7 plc and Citect SCADA systems.

Auxiliary equipment includes pneumatic and vacuum conveying systems, jet-pumping and dust-control systems

Final product is automatically weighed and packaged before being passed to a vault for export.

Final Recovery Plant at Pocket Beaches