Walking Jack-Up Platform
Namdeb
The Walking Jack-Up Platform Project, built for Namdeb in 2005, is a 17m x 13m walking jack-up platform for shallow water surf mining. The platform includes a primary and secondary mining system and process plant, and is capable of moving at 25 m/h.
The design has a hybrid 200mm jetpump and a 12/10 dredge pump mining system with a peak mining rate of 250 tph.
Key Specifications
- 350t gross mass
- 310t during walking operation
- 350t during mining operation
- 17m x 13m platform
- 25 m/h walking speed
- 2m walking step
- Primary & Secondary Mining tools
- Primary Hybrid 250mm jetpump + 14/12 gravel pump mining system
- Secondary Hybrid 125mm jetpump + 6/6 gravel pump mining system
- Primary tool mining rate - 250t/h average, 400t/h peak
- Secondary tool mining rate - 50t/h average, 80t/h peak
- Fully recoverable primary and secondary mining tool system